Reconstruction of sewage treatment facilities with a new construction of a mechanical dewatering shop for sewage sludge at 107 Baikalska St. Kropyvnytskyi, Kirovograd region
The following works were carried out as part of the reconstruction of the mechanical dewatering shop for sewage sludge:
Construction of a new separate building of the mechanical sludge dewatering shop;
Construction of a sludge tank;
Supply of on-site engineering networks to the workshop under construction
A mechanical dehydration unit was built to organize the process:
a tank of compacted excess sludge with mechanical mixing;
a raw sewage treatment plant sludge tank with mechanical mixing;
the building of the Centralized Processing Plant with the installation of two independent technological lines for mechanical dewatering of the sludge and excess sludge based on centrifuges;
laying of technological and auxiliary communications